1 | Page RYAN JACK
| Clovis, CA 93611 | (559)
231-8842 | rjsat1@yahoo.com PROJECT PLANNER / SCHEDULER Seasoned
Project Construction Manager / Scheduler with over 20+ years' experience in
Civil and Utility, Construction Project Manager, Supervisor and Team leader.
Highly skilled at generating Work Breakdown Structures, Scope of work for
Bidding Proposals, Scheduling, Conducting Site Walks for leasing and
development with property owner. Proficient in Risk Analysis, Contract
negotiations, Primavera P6 Scheduling, Site Acquisitions, and Cost Avoidance.
PROFESSIONAL
EXPERIENCE Project:
(Kingbird Solar Site) $89m lANCASTER, ca 07/2015 - Present PROJECT: (NORTH STAR ONE) $137M
menDOTA, CA 12/2014 - 07/2015 pROJECT:
(Dominion
kansas, kent,oro, adams) $200M
lemoOre & bakeRsfield, CA 08/2014 -12/2014 EPC Project Controls First Solar
Utilizing
SAP Reporting to create PM Accruals, Forecasting and Tie-Outs. Partner
with Planning and Project Team Leads, Engineering, Procurement, and material
handling to anticipate requirements necessary to meet plant completion
dates. Responsible
for partnering with PM on work preparation as appropriate based upon
financial implications, compliance issues and availability of resources. Collaborated
with PM and Project Team Leads in the identification and resolution of
productivity or performance issues of resources. Conduct
weekly Cost Plan and Risks review meetings with Project Manager and
Construction Manager. Utilizing
Primavera P6 to create Master Cost Loaded schedule for Solar EPC Projects.
PROJECT (at&t cELL TOWER OF THE FUTURE) $20M
Boston, MA 05/2014 - 07/2014 Wireless Construction Manager
Empire
Telecom
Site pre-inspections and coordinated
post-construction audits of Wave6 1C and 2C projects. Troubleshooting RF and VSWR issues. Review Construction Drawing CD’s to verify as builds
(Redlines) to county building and site spec. Overseeing construction and cutover for RxAIT. Supporting GSM /UMTS/LTE Tower upgrades and
Integrations. Reviewed RF data sheets for the planning of cost of
Labor and Materials for GSM, UMTS and LTE Projects. Provided oversight of construction execution on all
Long Term Evolution (LTE) construction projects. PROJECT (sprint 2.0 and 2.5 site audits) $50M
Portland, OR 08/2013 - 04/2014 Field
Construction Manager General Dynamics
Performing Sprint 2.5 site audit. Overseeing site cutover (integrations). Uploading close-out data via ART tool. Schedule
Site walks and Construction for Oregon and Southern Washington Area. Site
pre-inspections and coordinated post-construction audits? Review Construction Drawing (CD’s) to verify as
builds (Redlines) to county building and site spec. Verify azimuths of installed
antennas, and NTP1 completion; utilizing
Siterra. Verifying and uploading completed tasks to Siterra. Verifying site readiness for 595 EMS site walks. Create bid packages with the CDs and BOMs for General
contractors (GCs). Create and submit Purchase Orders
for site construction and Extended Fee’s for out of scope work. Proactively communicated progress
reports and specific project inquiries. PROJECT (AT&T Turf 2) $25M
Albuquerque, NM
05/2013 - 08/2013 Construction
Supervisor General Dynamics
Scheduling
Site Audits for New Mexico and Southern Colorado Area. Site
pre-inspections and coordinated post-construction audits. Provided oversight of construction execution on all
Long Term Evolution (LTE) construction projects. Proactively communicated progress
reports and specific project inquiries. Troubleshooter for site alarms. Verifying azimuths of installed
antennas. Performing site walks and audits. PROJECT (AT&T Turf 2) $5M
Fresno, CA
08/2012 - 11/2012 Project Controls Black & Veatch
Reviewed Radio Frequency Data Sheets (RFDS) for the
planning cost of Labor and Materials for GSM, UMTS and LTE Projects. Performed
True-up process on AT&T Order of Magnitude documents (OOM), Material
Purchase Order Request (MPOR) and Vendor Purchase order request (VPOR). Verified
accuracy of Construction Drawing (CD) and RFDS data sheets to generate NORAD entries and Bill of Materials (BOM). Corresponded bid packages with CDs, RFDS, OOM, and
BOM for General Contractors Negotiated Contracts for construction, performed site
walks and collaborated pricing materials. Provided oversight of construction execution on all
cell towers. Finalized drivers and materials, validated work
authorization and Invoices submitted from General Contractors (GCs). Tracked
material delivery, scheduled construction, and close-out documentation. Verified
Notice to Proceed (NTP1) completion; utilizing Documentum, Siterra and Quick
Base for site integration. INITIAL IMPULSE
Cleveland, OH 10/2002 - 07/2012 Project Scheduler/ Construction
Manager
Developed
and updated project plans for construction projects including information
such as project objectives, resources, equipment, schedules, funding, and
staffing. Utilized
P6 to create 14 different shot term schedules. Developed
and maintained master p6 schedule for each phase of the project. Maintained
project related primavera P6 database schedule files, codes, calendars, etc. Reported
weekly look-a-heads and critical path schedule to contractor and company
reviews. Maintained
project related primavera P6 database schedule files, codes, calendars. Built
and scheduled projects in Oracle Primavera P6 within the construction
environment. Developed
and managed Work Breakdown Structure (WBS) of construction projects. Reviewed
RF data sheets for the planning of cost of Labor and Materials for GSM, UMTS
and LTE Projects. Managed
Construction Team 10 field supervisors with 3 labors each. Created
bid packages with the CDs RFDS OOM and BOM for General contractors (GCs). CERTIFICATIONS
Primavera P6, RF cert, OSHA10 and